TERMINAL III PIER 2, 3, 4 and 5
| Building area: | 30.000m2 |
| Capacity: | 4 million passengers/ year |
| Total invesment: | IDR 198 billion |
| Terminal III Pier 2: | 2010 |
| Terminal III Pier 3: | 2011 |
LINGKING CORIDOR Terminal 2 - Terminal 3
The Linking Corridor will connect terminal 2 to terminal 3. The area will function as a shopping area for the airport users while going to terminal 3.
Airport Railway (East Gate)
In the efforts of improving the services for the airport users and avoiding traffic jam, a mode of mass transportation is necessary; in which it is train. The plan of building the airport railway will be in cooperated with PT Kereta Api (PT INKA).
The Airport Railway is planned to operate in 2010.